| TELFORD
PLAZA |
 |
TIS
have recently completed a project to design and install
an AMP NETCONNECT category 5E structured cabling system
at the Telford Plaza Building in Telford Town Centre. The
project was carried out on behalf of the Employment Agency.
The
project was again partnered with the Dodd Group who supplied
the electrical and mechanical services. TIS provided the
extensive network infrastructure.
|
|
|
| CELESTICA |
 |
|
Celestica
who have recently acquired the above building in Telford formerly
owned by NEC Technologies (manufacturers of mobile telephones)
have employed the services of TIS to design and install a large
fibre optic backbone and an enhanced category 5E cabling system.
TIS provided an AMP NETCONNECT cabling solution including a 24
core fibre optic back bone using the new MTRJ fibre optic connector
which has been designed and manufactured by AMP NETCONNECT part
of TYCO ELECTRONICS.
|
| Oxford
Glyco Science |
 |
|
Technology
Installation Services were commissioned by Oxford Glyco Sciences
(a large pharmaceutical company) to design and install a category
6 cabling system consisting of over 2000 outlets. The system installed
was an AMP NETCONNECT Quantum system (the category 6 range from
AMP/Tyco Electronics)
|
|
|
| Technology
Installation Services have recently installed approximately 1500
AMP Netconnect enhanced category 5E outlets at Great Mills UK Headquarters
in Poulton Bristol. Because it was vital to maintain network operation
during normal working hours, all of the work was carried out during
the evenings and weekends to avoid causing any disruption. The work
included backbone cabling and the integration of voice and data
over a Cat 5E Structured cabling system. |
|
|
| TIS
have recently carried out the design and installation of approximately
2000 enhanced category 5 and extensive fibre optic campus backbone
cables at the new Oxford Asymmetry building in Abingdon Oxford |